 |
Photos from some of the different jobs we have done at Geary's Plumbing.
Pictures from work done with Beatty Builders at the Peri's residence in Sherman, CT. |
 |
 |
This picture is of a sparks gas fireplace with log lighter valve installed in a masonry fireplace. Beatty Builders built the mantel, and cabinetry to the left and right of fireplace. |
This picture shows a mirrored vanity with wall mount faucet and vessel sink. Sink and faucet installed by Geary's Plumbing. The vanity was installed by Beatty Builders of Sherman, CT |
These pictures showcase at finish basement done at the Peri's, again in conjuction with Beatty Builders of Sherman, CT. Slab was removed to allow for plumbing for half bath. Gas piping was installed for a basement sparks unit with log lighter valve. |
Dual Buderus G215/4 Oil Fired Cast Iron Boilers with Tekmar 247 Staging Control & 10 Heating Zone Headers
Special thanks to Deak Electric LLC of New Milford, CT for the great wiring job! |
These pictures below are showing two different brands of Hybrid water heater we have installed. The unit on the left is a 50 gallon Rheem, and the unit on the right is an 80 gallon A.O. Smith. Both unit use half the electricity that a standard electric water heater would use. Both have a heat pump on the top that extracts the heat from the air around it, and works as a dehumidifier to make air less damp. Also, both units qualify for a $1500 tax credit. |
 |
 |
Buderus GB 142/60 95% Efficient Gas Fired Wall Hung Boiler with Vaughn 50 Gallon Indirect & 4 Zone Headers |
Custom bathroom done with Shaw Houseworks in New Canaan, CT |
|
|
|
 |
|